The smooth cooperation was also evident at Cloppenburg’s St. Josefs Hospital, for example, where the innovative anchor ensured good cooperation between scaffolders and façade builders: everything ran smoothly and efficiently: 300 isorocket® MINI Temporary units were already in place on the large façade when the scaffolding was erected. This meant that the façade builders had free rein right from the start and were able to insulate, plaster and paint the small rockets without any problems. A sparkling clean façade, because the isorocket® permanent scaffolding anchors leave only tiny holes after the scaffolding has been removed and the eyebolts unscrewed, which are sealed almost invisibly with thermal bridge-free plugs. Everything went perfectly and the client was delighted.